Improved equipment performance, manufacturability, and assembly through design changes (after joining the project during field testing). This automated system was commercialized in approximately half the usual product development timeline and in time for the IPPE tradeshow.
During college, I worked on a variety of individual and team technical projects. Some of these include a PLC-based vending machine, combining finite element analysis and optimization, a vehicle suspension redesign, and control of an inverted pendulum.